User:Ryan P. Long/Notebook/Physics 307L/2009/11/09: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
Line 21: Line 21:


First we connect the HP power supply to the Helmholtz coils on the Uchida apparatus with one of the BK multimeters in series.  Next the other BK multimeter is connected to the voltmeter jacks on the Uchida apparatus.  The Soar power supply is connected to the heater jacks on the Uchida. Lastly, the Gelman is connected to the electrodes on the Uchida.  
First we connect the HP power supply to the Helmholtz coils on the Uchida apparatus with one of the BK multimeters in series.  Next the other BK multimeter is connected to the voltmeter jacks on the Uchida apparatus.  The Soar power supply is connected to the heater jacks on the Uchida. Lastly, the Gelman is connected to the electrodes on the Uchida.  





Revision as of 15:31, 9 November 2009

Project name <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>

e/m Lab

Equipment

  • BK Precision Multimeter 2831B (x2)
  • HP 6384A DC Power Supply
  • Uchida Yoko e/m experimental apparatus model TG-13
  • Soar Corp. 7403 DC power supply
  • Gelman Instrument Company 500V Deluxe Regulated power supply
  • BNC Cables

Setup

First we connect the HP power supply to the Helmholtz coils on the Uchida apparatus with one of the BK multimeters in series. Next the other BK multimeter is connected to the voltmeter jacks on the Uchida apparatus. The Soar power supply is connected to the heater jacks on the Uchida. Lastly, the Gelman is connected to the electrodes on the Uchida.