Wittrup:Moving: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
No edit summary |
|||
Line 1: | Line 1: | ||
==Things we need to do== | ==Things we need to do== | ||
Get power supply for floor centrifuge hooked up. | Get power supply for floor centrifuge hooked up. Done (ljs) | ||
Install water purification system (see Steve Wetzel) on DI line. | Install water purification system (see Steve Wetzel) on DI line. | ||
Line 9: | Line 9: | ||
Pick date & send invitations to labwarming. | Pick date & send invitations to labwarming. | ||
Set up general purpose (i.e. UROP) mac. | Set up general purpose (i.e. UROP) mac. LJS set up a Mac (from 16-469) and a desk in E19-507 as a temporary UROP space. | ||
==Things we need to buy== | ==Things we need to buy== |
Revision as of 09:04, 19 January 2006
Things we need to do
Get power supply for floor centrifuge hooked up. Done (ljs)
Install water purification system (see Steve Wetzel) on DI line.
Hang up posters & reprints in the halls.
Pick date & send invitations to labwarming.
Set up general purpose (i.e. UROP) mac. LJS set up a Mac (from 16-469) and a desk in E19-507 as a temporary UROP space.
Things we need to buy
Kitchen: water purifier filter.
Coffee table between lounge chairs.