We are in Week 4 of the iGEM project.
<calendar>
name=IGEM:IMPERIAL/2007/Calendar
date = 2007/08/01
view=threemonths
format=%name/%year-%month-%day
weekstart=7
</calendar>
Proposals
Task List
Students
Supervisors
Today's Schedule
Name | Alex | Anthony | Ben | Cheuk | Dirk | James | Jerry | Lucas | Maira | Peixuan |
0900 | ||||||||||
0930 | ||||||||||
1000 | ||||||||||
1030 | ||||||||||
1100 | ||||||||||
1130 | ||||||||||
1200 | ||||||||||
1230 | ||||||||||
1300 | ||||||||||
1330 | ||||||||||
1400 | ||||||||||
1430 | ||||||||||
1500 | ||||||||||
1530 | ||||||||||
1600 | ||||||||||
1630 | ||||||||||
1700 | ||||||||||
1730 | ||||||||||
1800 | ||||||||||
Evening |
Questions
Debriefing
Laboratory
- Equipment
- It was discovered that there are certain limitations with the operation of the fluorometer, namely that there is no means for temperature control of specimen being tested.
- The engineer involved in the installation of the fluorometer in the Teaching Lab also proposed a possible tutorial of its operation. Date?
- Lab introduction.
- An introduction to techniques/methods involved in cloning was suggested.
- Protocols
- Due to the temperature-control limitations of the fluorometer, the current protocols need to be revised to incorporate this limitation.
Projects
- Biofilm
- Protocols were finished.
- Modelling of system constructs was started.
Wiki
- Reconstruction of the wiki continued
- It was suggested that a page containing the constructs used for the project be created. The page would be a "status report" of the progress/development of these constructs, including information such as level of availibility (if not, can it be synthesized?), ligation steps, links to protocols, etc.