IGEM:IMPERIAL/2007/Projects/Experimental Design

From OpenWetWare
Jump to navigationJump to search



We have identified three phases of experiments for each of the project:

  • Phase 1 - Intial testing of the promoters and test constructs in vitro
  • Phase 2 - Testing/Validation of the test constructs
  • Phase 3 - Testing/Validation of final constructs

In addition any overlap between the experiments of the projects has been identified and considered when making the experimental design.

Status

Time table

General timetable

Week 8 Week 9 Week 10
Monday - Refine the wiki Planning the week
Tuesday Prepare GFP solution-calibration
Construct Calibration Curve
Refine the wiki
Testing to reduce evaporation
Wednesday Test Home made cell extract
Test varying levels of cell extract
PROBLEM-Wrong GFP!!!! Purify GFP
DsRED arrives??
24hr experiment for mineral oil method
Thursday Purify GFP
Prepare DsRED constructs
Friday Prepare GFP solution-calibration
Construct Calibration Curve
Purify GFP + Test Concentration
Prepare DsRED constructs

CBD

Week 8 Week 9 Week 10
Monday -
Tuesday Phase 1 - test pT7
Wednesday 24 Hour Exp Room Temp
Thursday Test 20 and 37 °C,
Test GFP degradation at 20 and 37 °C
Define the thresholds of temperature
Friday Second day testing 20 and 37 °C

ID

Week 8 Week 9 Week 10
Monday - Purify LuxR
Tuesday test pLux in-vitro - 1nM AHL Refine AHL concentrations range 25°C
Purify LuxR if plasmid arrives
Purified LuxR ready today
Wednesday
Purify LuxR if plasmid arrives
Test Purified LuxR with construct 2
Thursday Clone in plasmid
Friday Test construct with 5 AHL concentrations - 25 °C Begin purification of LuxR