IGEM:IMPERIAL/2007/Projects/Experimental Design/Future Experiments
From OpenWetWare
Jump to navigationJump to search
Future Tests
(CE:Number of Cell extracts needed)
- Calibration curve GFP (CE:10)
- Calibration curve dsRED (CE:10)
- ID - Final Testing of AHL for dsRED (CE:20)
- CBD - Steep Gradient dsRED- ( Ask Alex about final app)
- Slow Gradient dsRED
- Final Test Temp range for DsREd(CE:20)
Total Cell Extracts Reactions Required For Project
- Week 10: 20
- Future testing: 60
- In Stock: 72 Reactions
Dependencies
- DsRed construct ( Tuesday)
- Maxi Preps:
- pLux Construct 2 - Wait for intial testing
- Negative Control - Constuct rbs:GFP:Terminator, No promoter