IGEM:PennState/Labbook/GalenLynch/2007-7-9: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
<h1>'''July 9th, 2007''': 9:30-?:??</h1>
<h1>'''July 9th, 2007''': 9:30-6:15</h1>
Results from over the weekend: Initial pfx pcr failed, second attempt was a success. Restrtiction, extraction, purification, ligation, and transformation was performed on the successful bands. Restriction results were verified by gel, with discernable bands. Despite this, transformations were unsuccessful.
Results from over the weekend: Initial pfx pcr failed, second attempt was a success. Restrtiction, extraction, purification, ligation, and transformation was performed on the successful bands. Restriction results were verified by gel, with discernable bands. Despite this, transformations were unsuccessful.
<h2>Transformations</h2>
Today's plans: Repeat ligations and transformations.
Today's plans: Repeat ligations and transformations.
*New vial of T4 ligase purchased
*New vial of T4 ligase purchased
Line 16: Line 17:


All ligations were performed for both ten minutes and an hour, producing two sets of plates.
All ligations were performed for both ten minutes and an hour, producing two sets of plates.
<h2>Meeting</h2>
<table|left>
  <tr>
  <td>'''iGEM meeting July 9th 2007'''</td>
  </tr>
  <tr>
  <td>[[Image:PSU GFL 2007 79m Slide 1.PNG|thumb|Slide 1]]</td>
  <td>[[Image:PSU GFL 2007 79m Slide 2.PNG|thumb|Slide 2]]</td>
  <td>[[Image:PSU GFL 2007 79m Slide 3.PNG|thumb|Slide 3]]</td>
  </tr>
  <tr>
  <td>[[Image:PSU GFL 2007 79m Slide 4.PNG|thumb|Slide 4]]</td>
  <td>[[Image:PSU GFL 2007 79m Slide 5.PNG|thumb|Slide 5]]</td>
  <td>[[Image:PSU GFL 2007 79m Slide 6.PNG|thumb|Slide 6]]</td>
  </tr>
  <tr>
  <td>[[Image:PSU GFL 2007 79m Slide 7.PNG|thumb|Slide 7]]</td>
  </tr>
</table>

Latest revision as of 09:44, 10 July 2007

July 9th, 2007: 9:30-6:15

Results from over the weekend: Initial pfx pcr failed, second attempt was a success. Restrtiction, extraction, purification, ligation, and transformation was performed on the successful bands. Restriction results were verified by gel, with discernable bands. Despite this, transformations were unsuccessful.

Transformations

Today's plans: Repeat ligations and transformations.

All ligations were performed for both ten minutes and an hour, producing two sets of plates.

Meeting

<table|left>

iGEM meeting July 9th 2007

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
Slide 7