Klapperich Lab:Notebook/Lab Meeting Notes/2008/12/09: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
Cmklapperich (talk | contribs) |
Cmklapperich (talk | contribs) |
||
Line 20: | Line 20: | ||
* First samples ? <br> | * First samples ? <br> | ||
* Plaque Assay <br> | * Plaque Assay <br> | ||
* Alex needs to be trained to make SU molds. Trained to make the monoliths. <br> | * Alex needs to be trained to make SU molds. Trained to make the monoliths (by Hussam By 1/15/09). <br> | ||
* Hussam: Flu fixture done. <br> | * Hussam: Flu fixture done. <br> | ||
* | * | ||
Line 33: | Line 33: | ||
† COBRA <br> | † COBRA <br> | ||
* Mark- Control circuit - This will be done by January.<br> | * Mark- Control circuit - This will be done by January.<br> | ||
* Evap quantification experiments ongoing. (JD, JZ)<br> | * Evap quantification experiments ongoing. Still working on live/dead assay. (JD, JZ)<br> | ||
* Substrates (JZ)<br> | * Substrates (JZ)<br> | ||
* DOE for the experiment. <br> | |||
* Colloid experiment. inconclusive. Look at SEMs <br> | |||
<br> | <br> | ||
† Valve Array/Valve building (FJ) <br> | † Valve Array/Valve building (FJ) <br> | ||
Line 47: | Line 49: | ||
* <br> | * <br> | ||
* E. Coli experiments with fluorescence. <br> | * E. Coli experiments with fluorescence. <br> | ||
* Strobe experiments? Jason cannot do them, perhaps | * Strobe experiments? Jason cannot do them, perhaps MCK can. MCK will talk to Jason this week. <br> | ||
<br> | <br> | ||
† CIMIT- Colson Grant<br> | † CIMIT- Colson Grant<br> | ||
Line 57: | Line 59: | ||
* Improve the gel concentration 1.2% agarose. See if you can separate out primer dimers. UPDATE?<br> | * Improve the gel concentration 1.2% agarose. See if you can separate out primer dimers. UPDATE?<br> | ||
* Look into Melting temp analysis on the 7300 - Done. what is contaminated? <br> | * Look into Melting temp analysis on the 7300 - Done. what is contaminated? <br> | ||
* Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed - helped a bit. <br> | * Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed - helped a bit. ON HOLD <br> | ||
'''* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. <br>''' | '''* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. ON HOLD<br>''' | ||
* | * Try microscope for looking a fluor. <br> | ||
* | * 52, 60, 65 C repeats. <br> | ||
* <br> | * <br> | ||
<br> | <br> | ||
Line 69: | Line 71: | ||
* <br> | * <br> | ||
* <br> | * <br> | ||
† F31: Cochlea <br> | † F31: Cochlea <br> | ||
* Paper submitted.<br> | * Paper submitted.<br> | ||
* | * set up adviser meeting Jan <br> | ||
<br> | <br> | ||
† Silica Optimization (Lambda): <br> | † Silica Optimization (Lambda): <br> |
Revision as of 11:58, 9 December 2008
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
9 December 2008 Lab Meeting Agenda† Stephanie's research report today.
† Announcements
† COBRA
* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. ON HOLD
† F31: Cochlea
|