9 December 2008 Lab Meeting Agenda

† Stephanie's research report today.

† Announcements

  • Meeting on 12/16.
  • No meeting on 12/23
  • Meeting Time for Spring Semester (starting week of 1/16). Put your NOT OPEN times here.


† Flu R01

  • First samples ?
  • Plaque Assay - first samples today. Ref stock 2x10^4 pfu/ml
  • Alex needs to be trained to make SU molds. Trained to make the monoliths.
  • Hussam: Flu fixture done.


† SEPSIS Project - CIMIT Bird Flu

  • Sonali working on first draft of new version paper.


†RNA project

  • Jeff Braman will visit December 12th. 9:30am Visit to Cathie's lab and lab tour. Meetings starting at 10am in Fraunhofer. Sonali and Cathie to attend.
  • Do cDNA prep. Spec, gels, send to Jeff B. Shipping?

† COBRA

  • Mark- Control circuit - This will be done by January.
  • Evap quantification experiments ongoing. (JD, JZ)
  • Substrates (JZ)


† Valve Array/Valve building (FJ)

  • Turn over platform to Teddy



† Fraunhofer: LOAC

  • So close!


† Biointerfaces group


  • E. Coli experiments with fluorescence.
  • Strobe experiments? Jason cannot do them, perhaps MK can.


† CIMIT- Colson Grant

  • First pages of first IRB started last week. Target date 1/1/09
  • STAR-CD Renewal - January ($2K)


† PCR


  • Improve the gel concentration 1.2% agarose. See if you can separate out primer dimers. UPDATE?
  • Look into Melting temp analysis on the 7300 - Done. what is contaminated?
  • Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed - helped a bit.

* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture.

  • Design new lambda phage assay with longer product.
  • What do we need to finish the paper?


† RCA

  • Cathie submitted One pager Whitepaper. Waiting for response.


† Senior project





† F31: Cochlea

  • Paper submitted.


† Silica Optimization (Lambda):