User:Fermenter User/Notebook/DOE Workshop 20110405: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
Line 63: | Line 63: | ||
! width="50pt"|Run !! width="50pt"|Std !! class="unsortable" |Group || class="unsortable" | Day !! class="unsortable" |Temp !! class="unsortable"|DO !! class="unsortable"|pH !! class="unsortable" | Day !! width="80pt"|OD !! width="80pt"|Media !! class="unsortable" | Day !! width="120pt"|Response 1 !! width="120pt"|Response 2 || width="120pt"|Response 3 | ! width="50pt"|Run !! width="50pt"|Std !! class="unsortable" |Group || class="unsortable" | Day !! class="unsortable" |Temp !! class="unsortable"|DO !! class="unsortable"|pH !! class="unsortable" | Day !! width="80pt"|OD !! width="80pt"|Media !! class="unsortable" | Day !! width="120pt"|Response 1 !! width="120pt"|Response 2 || width="120pt"|Response 3 | ||
|- style="color: gray; background:#f0f0f0;" | |- style="color: gray; background:#f0f0f0;" | ||
| 1||15||I||-1||NA||NA||NA||0||( | | 1||15||I||-1||NA||NA||NA||0||(3.500)||(1080)||1||(R1)||(R1)||(R1) | ||
|- style="color: gray; background:#f0f0f0;" | |- style="color: gray; background:#f0f0f0;" | ||
| 2||14||I||-1||NA||NA||NA||0||( | | 2||14||I||-1||NA||NA||NA||0||(0.032)||(840)||1||(R2)||(R2)||(R2) | ||
|- style="color: gray; background:#f0f0f0;" | |- style="color: gray; background:#f0f0f0;" | ||
| 3||4||I||-1||NA||NA||NA||0||( | | 3||4||I||-1||NA||NA||NA||0||(0.263)||(650)||1||(R3)||(R3)||(R3) | ||
|- style="color: red; background:yellow" | |- style="color: red; background:yellow" | ||
| 4||9||A||1||NA||NA||NA||2||(OD=)||( ml)||3||(R4)||(R4)||(R4) | | 4||9||A||1||NA||NA||NA||2||(OD=)||( ml)||3||(R4)||(R4)||(R4) | ||
Line 73: | Line 73: | ||
| 5||17||A||1||NA||NA||NA||2||(OD=)||( ml)||3||(R5)||(R5)||(R5) | | 5||17||A||1||NA||NA||NA||2||(OD=)||( ml)||3||(R5)||(R5)||(R5) | ||
|- style="color: red; background:#f0f0f0;" | |- style="color: red; background:#f0f0f0;" | ||
| 6||3||A||1||NA||NA||NA||2||( | | 6||3||A||1||NA||NA||NA||2||(0.055)||(670)||3||(R6)||(R6)||(R6) | ||
|- style="color: blue; background:yellow;" | |- style="color: blue; background:yellow;" | ||
| 7||12||B||2||NA||NA||NA||3||(OD= )||( ml)||4||(R7)||(R7)||(R7) | | 7||12||B||2||NA||NA||NA||3||(OD= )||( ml)||4||(R7)||(R7)||(R7) | ||
|- style="color: blue; background:#f0f0f0;" | |- style="color: blue; background:#f0f0f0;" | ||
| 8||7||B||2||NA||NA||NA||3||( | | 8||7||B||2||NA||NA||NA||3||(0.146)||(660)||4||(R8)||(R8)||(R8) | ||
|- style="color: blue; background:#f0f0f0;" | |- style="color: blue; background:#f0f0f0;" | ||
| 9||1||B||2||NA||NA||NA||3||( | | 9||1||B||2||NA||NA||NA||3||(0.058)||(690)||4||(R9)||(R9)||(R9) | ||
|- style="color: gray" | |- style="color: gray" | ||
| 10||19||A||3||NA||NA||NA||4||(OD= )||( ml)||5||(R10)||(R10)||(R10) | | 10||19||A||3||NA||NA||NA||4||(OD= )||( ml)||5||(R10)||(R10)||(R10) |
Revision as of 18:47, 7 April 2011
WORK B1
Teaching:
Where: LSI 4th floor CBR Fermentation Suite (Rm 4332) and Rm 4332 Attending:
Group A:(After you log in with your personal password, click the "EDIT" button on the right side of GROUP A and list your name below) Chris Tam
Group B:(After you log in with your personal password, click the "EDIT" button on the right side of GROUP B and list your name below) MARY TANG
Off-line Measurement
Day -1 (April 4th, Mon)
Day 1 (April 5th, Tue) <-- WORKSHOP STARTS
10:00 - 11:00 Presentation (Rm 4.303) # Introduction about our Facility and Services # Introduction about bioreactors # How to assemble bioreactors Power Outage started around 8pm and lasted approximately 2.5 hrs. Bio-controllers and computer were connected to UPS (undisrupted power suppliers). Unfortunately, data has been lost due to power outage. Run #4 losted power during fermentation. End point looked ok. Run #5 was not affected by power. However, pH control was not done properly. Run #6 was not affected by power. End point looked ok. => Run #5 will be repeated at last as additional runs. Day 2 (April 6th, Wed)
10:00 - 11:00 Presentation (Rm 4.303) # Fermentation Database and Websites # How to Install Bioreactors # How to Setup Bio-controllers Another Power Outage started around 6:45pm and lasted approximately 1.5 hrs. Bio-controllers and computer were connected to UPS (undisrupted power suppliers). Unfortunately, data has been lost due to power outage. Run #7 losted power during fermentation. End point looked ok. Run #8 was not affected by power. End point looked ok. Run #9 was not affected by power. End point looked ok. => Run #7 will be repeated at last as additional runs. Day 3 (April 7th, Thu)
10:00 - 11:00 Presentation (Rm 4.303) # DOE Step 1. Design Experiments Due to unnotified power outage, two of emergency power lines were introduced into fermentation suite. One was connected to a computer and one was connected to incubator. Also, each fermenter is now connected to batteries to provide over 500 min capacity. Day 4 (April 8th, Fri)
NO PRESENTATION Day 5 (April 9th, Sat)
NO PRESENTATION
Day 6 (April 10th, Mon)
10:00 - 11:00 Presentation (Rm 4.303) # DOE Step 3. Analysis of Responses (Part I): Fit Summary and Model Selection
Day 7 (April 11th, Tue)
10:00 - 11:00 Presentation (Rm 4.303) # DOE Step 3. Analysis of Responses (Part II): ANOVA, Diagnostics, and Model graphs Day 8 (April 12th, Wed)
10:00 - 11:00 Presentation (Rm 4.303) # DOE Step 4. Optimization Day 9 (April 13th, Thu)
10:00 - 11:00 Presentation (Rm 4.303) # Case Studies: Publication Day 10 (April 14th, Fri)
9:30 - 12:00 DOE analysis with workshop data (Rm 4.307 Western Lantern) Helful links
|