Klapperich Lab:Notebook/Lab Meeting Notes/2008/11/04: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
Cmklapperich (talk | contribs) |
Cmklapperich (talk | contribs) No edit summary |
||
(8 intermediate revisions by 4 users not shown) | |||
Line 12: | Line 12: | ||
† Announcements<br> | † Announcements<br> | ||
* 720 Migration in full swing. Make sure things you do not want "shared" are clearly marked. Check with Sonali before using any space in 709. <br> | * 720 Migration in full swing. Make sure things you do not want "shared" are clearly marked. Check with Sonali before using any space in 709. <br> | ||
* ALL - please heed lab safety rules. Re-read Sonali's email of earlier this week!<br> | |||
<br> | <br> | ||
† Flu R01 <br> | † Flu R01 <br> | ||
Line 33: | Line 34: | ||
† Valve Array/Valve building (FJ) <br> | † Valve Array/Valve building (FJ) <br> | ||
* Waiting for fixture still from Melissa. Hopefully this week. UPDATE? <br> | * Waiting for fixture still from Melissa. Hopefully this week. UPDATE? <br> | ||
* | * Received schematic and quote. Frank met with Dr. Do to go over schematic and see what's next. Met with Sonali (3 Nov) to better delineate system requirements, will meet with Mark to coordinate fixture/pressure-driven flow system interfacing before submitting revised specs to Superior Fluid Solutions.<br> | ||
<br> | <br> | ||
† Fraunhofer: LOAC <br> | † Fraunhofer: LOAC <br> | ||
Line 42: | Line 43: | ||
<br> | <br> | ||
† Biointerfaces group <br> | † Biointerfaces group <br> | ||
* | * Mask writer's calibration was done. <br> | ||
* | * Paul Mak told that Mask aligner at Photonics center has UV filter. Try that machine.<br> | ||
* Preliminary E. coli experiment is ongoing. <br> | |||
* Try DAPI bacteria stain to visualize e-coli soon. <br> | |||
<br> | <br> | ||
† CIMIT- Colson Grant<br> | † CIMIT- Colson Grant<br> | ||
Line 50: | Line 53: | ||
<br> | <br> | ||
† PCR <br> | † PCR <br> | ||
* QQ gel issues. Resolved?? <br> | |||
* QQ gel issues. Resolved <br> | |||
* Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed - Will try after fixes and report next week. UPDATE? <br> | * Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed - Will try after fixes and report next week. UPDATE? <br> | ||
'''* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. <br>''' | '''* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. <br>''' | ||
* Qingqing has to do experiments with MinCheol's designs. AS SOON AS CLEANING CONTEROLS ARE IN PLACE. <br> | * Qingqing has to do experiments with MinCheol's designs. AS SOON AS CLEANING CONTEROLS ARE IN PLACE. <br> | ||
* Mincheol will work on DNA migration simulation after IMECE 2008.<br> | |||
<br> | <br> | ||
† RCA <br> | † RCA <br> | ||
Line 64: | Line 67: | ||
<br> | <br> | ||
† F31: Cochlea <br> | † F31: Cochlea <br> | ||
* | * Received paper edits from Doug.<br> | ||
* <br> | * Make changes and give to Cathie ASAP. <br> | ||
* Journal chosen? <br> | |||
* Need to order Alpha-Tectorin protein.<br> | |||
<br> | <br> | ||
† Silica Optimization (Lambda): <br> | † Silica Optimization (Lambda): <br> |
Revision as of 08:16, 4 November 2008
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
4 November 2008 Lab Meeting Agenda† Mark's research report today. † Announcements
† COBRA
* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture.
|