Klapperich Lab:Notebook/Lab Meeting Notes/2009/02/26: Difference between revisions
Jaephil Do (talk | contribs) |
Jaephil Do (talk | contribs) |
||
Line 20: | Line 20: | ||
* Modified Schedule this week. <br> | * Modified Schedule this week. <br> | ||
* Plaque Assay. <br> | * Plaque Assay. <br> | ||
<br> | <br> | ||
† SEPSIS Project <br> | † SEPSIS Project <br> | ||
* Submitted to Integrative Biology. <br> | * Submitted to Integrative Biology. <br> | ||
* <br> | * <br> | ||
* <br> | * <br> | ||
<br> | <br> | ||
†RNA project | †RNA project | ||
* Samples Sent? <br> | * Samples Sent? <br> | ||
* | * New proposal with Fraunhofer for food. <br> | ||
<br> | <br> | ||
† COBRA <br> | † COBRA <br> | ||
* Integration test from here forward. <br> | * Integration test from here forward. <br> | ||
* Test ongoing with Rubber adhesive tape | * Test ongoing with Rubber adhesive tape for Sol-gel. <br> | ||
- | |||
* Test with engineered SERS substrates <br> | * Test with engineered SERS substrates <br> | ||
- Still in discussion for dicing <br> | - Still in discussion for dicing <br> |
Revision as of 12:34, 26 February 2009
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
26 February 2009 Lab Meeting Agenda
Bioanalyzer - 2nd training March 3 9:30am † Announcements
- Still in discussion for dicing
- Try glass fixture.
- Do Rhodamine.
-Need a size specific positive control. PS beads? charged?
† Silica Optimization (Lambda):
Specifically buy http://products.invitrogen.com:80/ivgn/en/US/adirect/invitrogen?cmd=catProductDetail&entryPoint=adirect&productID=N7565&messageType=catProductDetail |